Blog


29

Ago 2016

Club of Golf-Torres F Hall of feasts

The project is a new work in expansion that considers a multipurpose in basement room and a paddle on the deck-level Garden Court. The development has 700 m2 of construction and will give service to 3 towers of departments.


Gelati 65

15

Ago 2016

Gelati 65

The Executive project of architecture, structure and facilities development, BIM modeling for detection of interferences and inconsistencies in information between disciplines


Toluca Train – Mexico

15

Ene 2016

Toluca Train – Mexico

Coordination of construction and control of work in the construction of the section 3 of the viaduct elevated of the train long-distance Toluca-Valley of Mexico, from the portal East of the tunnel until the station Observatory of the Metro line 1.


Golf Club – D Towers

16

Ago 2015

Golf Club – D Towers

Coordination of Executive design, value engineering, preparation of budget basis, modeling BIM for detection of interference between disciplines and quantifications in the project of construction of 2 17-story towers each.


Club Residencial Bosques – Tower 5

15

Ago 2015

Club Residencial Bosques – Tower 5

Club residential Woods-Tower 5. Modeling BIM for detection of interference and inconsistencies in information between disciplines


BSF Apartment

15

Ago 2015

BSF Apartment

Project of construction of interiors of the Department B1002 in towers of the Park of the fractionation forests of Santa Fe.


LBA Apartment

21

Ene 2012

LBA Apartment

Construction of the Interior of a PentHouse in the Tower corners of the Park within the development forests of Holy faith. Achieved high standards of quality of materials, always thinking about the quality of design and durability.


Martin Mendalde

15

Ago 2011

Martin Mendalde

Architectural work management, supervision of executed work and identification of solutions for the construction of an apartment building in the Del Valle neighborhood.


Club de Golf Bosques – F Towers

21

Ene 2011

Club de Golf Bosques – F Towers

Supervision of work and control budget in the construction of 3 towers of departments of 17 floors each a.


INMEGEN

21

Ene 2010

INMEGEN

Management of projects for the term of the works of the new headquarters of the Institute national of medicine Genomics, specifically the audit technical and the review of projects and of contracts.



Page 1 of 212